News

Latest News

Browse news by date :

Construction delays

A combination of factors now delays construction of San Diego II. Previously, OSW planned to put out a call for construction bids on the 1.23 KGD advanced multistage flash (MSF) distillation plant...

Water Desalination Report, 26-08-1965

Brackish test center

Construction of a Brackish Water Test Engineering Center ~- at a separate inland location complementing the Wrightsville Beach and West Coast centers -- is also covered by the expanded desalting...

Water Desalination Report, 26-08-1965

Backing for Gov't desalting program comes from industry

Strong and unanimous endorsement of the U.S. Desalting Program as being waged by Govt, jointly with industry came from three of the nation's principal nuclear-desalting suppliers at Congressional...

Water Desalination Report, 19-08-1965

A-C desalting projects

Nickel said Allis was engaged in: (1) in-house design of a 2000 GPD high temperature flash desalination pilot plant, on which the co. estimates spendings of about $250,000 of its own funds; (2)...

Water Desalination Report, 19-08-1965

Westinghouse recommendations

John Simpson, Westinghouse V-P, said his firm had built 57 desalting plants around the world, but that desalting's full potentiality can't be tapped until product water costs are substantially...

Water Desalination Report, 19-08-1965

Water react best

GE's Atomic Power Equipment Dept. Mgr., George White, also underscored the utility of desalting in meeting scarce water situations both domestically and abroad. Unstinting approval of the Federal...

Water Desalination Report, 19-08-1965

Burns and Roe established new office in Spain

With the accent to be on desalting plants, Burns and Roe has established a new office in Madrid, Spain. The new Co., wholly-owned by B&R, to be called Burns y Roe Internacional, lists Kenneth...

Water Desalination Report, 19-08-1965

Overseas construction

A marketing idea which may well lead to overseas construction of desalting plants was handed to U.S. industry at last week's nuclear industry posture hearings (see story p. 1) before the Joint...

Water Desalination Report, 19-08-1965

High Praises

High praise indeed was lavished upon Congress and its desalting leaders for voting S-24, authorizing'the expanded desalting program, by President Johnson last week when he signed the bill into the...

Water Desalination Report, 19-08-1965

Study to eliminate drought

A federal task force panel to study at the President's request how desalting might help on the Northeast drought picture held its first meeting Monday. The President asked the group to submit its...

Water Desalination Report, 19-08-1965

North Batinah IWP

An RFP is scheduled for the third quarter of 2019. Nine teams submitted statements of qualificati...

Salalah 4 IWP

An RFQ is scheduled to be released in the third quarter of 2019, followed by an RFP in Q4.

Massirah IWP

An RFQ is scheduled to be released in the third quarter of 2019. Bidding is scheduled to take pla...

Barka 5 IWP

An RFP has been issued, with a bid deadline of 26 September 2019. The intention is to award the p...

Ghubrah 3 IWP

An RFP is still pending for the project as OPWP awaits approval from the authorities. The intenti...

Khasab IWP

The project has been cancelled after local water provider Diam indicated it could meet projected ...

Los Pelambres

The winner of the contract to supply the desalination system is expected to be announced in Augus...

Skhira SWRO

To build a 200,000m3/d seawater reverse osmosis plant near the coastal town of Skhira in order to...

Eastern Provinces Desalination, Iran

Toossab Consulting Engineers has completed a feasibility study with Witteveen+Bos, and has establ...

Monterey Peninsula Water Supply Project, CA

On 15 July 2019, the Monterey County Board of Supervisors voted 3-2 to deny the appeals by the Ma...

Devbhoomi Dwarka desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Bhavnagar desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Mandvi desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Pipavav desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Porbandar desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Sutrapada desalination plant

The bid submissions deadline has been extended again, and now falls on 8th August 2019.

Jorf Lasfar extension

OCP is currently in discussion with potential operators ahead of potentially putting the existing...

Phosboucraâ SWRO

To build a 20,500m3/d seawater reverse osmosis desalination plant at OCP's Phosboucraâ phosphate ...

Gabès desalination plant phase 1

The government has launched a request for qualifications, and interested companies have until 2nd...

Dahej desalination plant

A formal letter of award is understood to have been issued to the winning joint venture of L&T an...

Morro Bay WWTP, CA

At its meeting on 11 July 2019, the California Coastal Commission unanimously approved a consolid...

Tampa Bay Desalination Expansion, FL

Tampa Bay Water has shortlisted Hazen and Sawyer (as the top-ranked bidder) and CDM Smith (as the...

Santa Margarita Conjunctive Use Project, CA

Four teams responded by the bid deadline in July 2019: Filanc/Alberici (joint venture), WM Lyles,...

North Pleasant Valley Water Desalter Phase 1

At its meeting on 10 July 2019, City Council approved both the award of the construction manageme...

Grand Cayman SWRO

To build, operate and maintain a 9,000m3/d seawater reverse osmosis plant on Grand Cayman under a...

West Coast Basin Brackish Water Reclamation Project

vered by the end of summer 2019. The first draft of the feasibility study, undertaken by Jacobs, ...

Umm al Quwain IWP

A team comprising ACWA Power and a vehicle owned by Mubadala Investment Company has signed a wate...

Quintero desalination plant

Bids for the EPC contract are currently under evaluation, and an award is expected in August 2019...

Doha (Kuwait) SWRO (phase 2)

The client has issued a request for qualifications from interested contractors. The deadline for ...

GWRS Phase III, CA

Bids are now due in by 23 July 2019, with a recommendation on a winner to follow later in 2019. C...