News

Latest News

Browse news by date :

Small skid flash plant goes to Aqua-Chem

AQUA-CHEM ALSO WON THE SMALL SKID-MOUNTED FLASH PLANT design-supply contract from OSW. Price of the contract is $171,300. Delivery of the 40,000 GPD skid-mounted plant is required by April 30, 1967...

Water Desalination Report, 14-07-1966

Frank Cousins resigned

English Minister of Technology Frank Cousins has resigned his post, and his exodus last week from Prime Minister Wilson's labor gov't could take some of the starch out of the joint United Kingdom...

Water Desalination Report, 14-07-1966

Nuclear dual desalting design now completed

Completed design details of a 72 MGD 400 MWE nuclear desalting dual station have been reported by Hans Kronberger, UKAEA's desalting chief. Kronberger, who as head of the AEA Reactor Div. at Risley...

Water Desalination Report, 14-07-1966

Desalting in KSA

Desalting could find major use in Eastern Saudi Arabia -- but not via building of plants to convert sea water from the Arabian Gulf. A major conclusion of water supply-demand studies by Bechtel is...

Water Desalination Report, 14-07-1966

Water quality standards

Bechtel engineers conducting the desalting studies discussed health effects of drinking the 2000 or 3000 ppm water with authorities of the World Health Organization hospital at Dammam. U.S. Public...

Water Desalination Report, 14-07-1966

Dual fossil fuel plant in Jidda reach final approval

During King Faisal's U.S. visit, Prince Mohamed Faisal visited OSW to reach final understading on going ahead under the U.S.-Saudi Arabia bilateral agreement for construction of a dual fossil-fired...

Water Desalination Report, 14-07-1966

Di Luzio to head Interior Dept. Water Programs

President Johnson appointed OSW Director Frank C. Di Luzio on Tuesday as Interior Dept.'s first Aast. Sect'y. for Water and Water Pollution. The appointment announced from the President's ranch in...

Water Desalination Report, 07-07-1966

Four companies submit desalting costs for OSW desalting plant

Badger, Applied Research and Engineering Ltd., General Electric and C.F. Braun submitted low desalting costs in the completed series of 50 MGD plant conceptual designs sponsored by OSW. Braun, with...

Water Desalination Report, 07-07-1966

Braun and Badger suggest to use titanium

Titanium condenser tube utilization also was ruled out by most of the design studies. Again, however, Braun and Badger elected titanium for its noncorrosion and pitting resistance characteristics...

Water Desalination Report, 07-07-1966

Operating-Maintenance contract for Roswell plant goes to Westinghouse

OSW selected the Westinghouse Water Province Dept. to operate the 1 MGD vapor compression demonstration plant at Roswell, N,M. under a 4-yr. cost-plus-fixed-fee contract, subject to renewal...

Water Desalination Report, 07-07-1966

Facility E IWPP

A request for proposals has been issued, with a deadline of 10 February 2020. Sources have indica...

Barka 5 IWP

Just two teams are understoof to have submitted bids for the project: GS Inima and Veolia. A team...

Cabo San Lucas expansion

In a recent statement, the mayor of Los Cabos indicated that the project tender would be issued b...

Faure permanent reuse scheme

Detailed design of the plant is still in progress, and a construction tender is slated for 2020-2...

Yanbu 4 IWP

Proposals were received from the following consortia: 1) ACWA Power/Gulf Investment Corporation/A...

Gaza Central Desalination Plant

Expressions of interest in the DBO contract are now due in on 11 November 2019. Two participants ...

Tuticorin FGD desal

Tender documentation will be made available from 11 October 2019, and a pre-bid meeting has been ...

Águilas SWRO expansion

The contract for drawing up the initial design project has been awarded to Arada for €125,292.

Mahdia (phase 1)

Sonede is preparing the terms of reference ahead of a tender for a consultant to carry out pre-fe...

Sfax

Sonede now expects to award the contract in Q2 2020. Two of the six shortlisted bidders submitted...

Morro Bay WWTP, CA

Suez has been confirmed as the winner of the MBR systems supply contract.

Fortaleza SWRO

The client has posted a second draft "edital" and accompanying contract documents to its website,...

Tangestan SWRO

The client re-issued a request for statements of qualification on 29 September 2019. The submissi...

Asaluyeh SWRO

The client re-issued a request for statements of qualification on 29 September 2019. The submissi...

Kundli CETP upgrade

To upgrade an existing 4,000m³/d common effluent treatment plant (CETP) to include tertiary treat...

Southeast Wellfield (Polk County, FL)

A conceptual design report for the proposed Southwest Wellfield WTP – developed by Carollo Engine...

Uran SWRO, Mumbai

A re-tender is now likely in September 2019.

Cabo San Lucas expansion

The tender is now expected to be issued in Q4 2019. On 30 July 2019, the governor of Baja Califor...

Pure Water Soquel, CA

SoQs for the progressive design-build contract relating to the AWPF and the addition of tertiary ...

Torrevieja SWRO expansion

The list of bidders for the 2-year, €670,000 engineering services contract relating to the initia...

Alicante I

On 24 September 2019, Sacyr's €8.001 million bid was declared the most advantageous, and the cont...

Alicante II

On 24 September 2019, Sacyr's €8.001 million bid was declared the most advantageous, and the cont...

Beaumont Salt Mitigation Facility, CA

At its meeting on 2nd October 2018, City Council voted to award the construction contracts, as fo...

North City Pure Water Facility

The initial $1.25 billion phase of the project will be part-funded through a $614 million WIFIA l...

Port of Cape Town SWRO

TNPA is looking to appoint a consultant in the next couple of months, with a view to completing s...

Palo Alto Reuse, CA

At its meeting on 23 September 2019, Palo Alto City Council is due to review a draft treated effl...

Asaluyeh Rural Complex SWRO

The client re-issued a request for statements of qualification on 16 September 2019. The submissi...

Grünau desal pilot

NamWater has launched separate RFPs for the construction of the plants at Grünau and Bethanie. Th...

Bethanie Desal Pilot

NamWater has launched separate RFPs for the construction of the plants at Grünau and Bethanie. Th...

Ventura Water IPR/DPR phase 1

The final EIR relating to the proposed advanced water purification facility was delivered in mid-...